-
vpadmin in ArchiMate
Gap
Related Post
This ArchiMate example illustrates the gap between the Baseline and Target infrastructure, showing which of the elements of the infrastructure are added to or removed from the Baseline.
Import into your Project
Open diagram in Visual Paradigm [?]Copy the URL below, paste it in the Open Project windows of Visual Paradigm and press Enter to open it |
Posted by: Carol Sandusky