Here is a Product Breakdown Structure example. Product Breakdown Structure (PBS) is a similar construct as WBS, but is based on the structure of product rather than the type of activities. Lower levels in PBS describe the structure of item on level above. The top level of PBS is the product. Second level may consist of the major components of the product. Lowest level should contain items that are "comprehensible".