In this activity diagram example, we see swim lanes and the use of rectangles between the swim lanes to represent the flow of completing an assignment. In addition there's an hour glass type symbol (two triangles, joined at their points), to represent an event related to the passage of time.
Import into your Project
Open diagram in Visual Paradigm [?]Copy the URL below, paste it in the Open Project windows of Visual Paradigm and press Enter to open it |
Posted by: Ricardo Poole