This is a Sequence Diagram example that shows you how it can deal with timing information.
- Constraints: are usually used to show timing constraints on messages. They can apply to the timing of one message or intervals between messages.
- Durations: The duration of activations or the time between messages can be show with construction marks.
Import into your Project
Open diagram in Visual Paradigm [?]Copy the URL below, paste it in the Open Project windows of Visual Paradigm and press Enter to open it |
Posted by: Shalonda Moran